<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Transport Advisory, Design and Delivery Archives - Vitruvius</title>
	<atom:link href="https://vitruvius.co.nz/project_category/transport-engineering/feed/" rel="self" type="application/rss+xml" />
	<link>https://vitruvius.co.nz/project_category/transport-engineering/</link>
	<description></description>
	<lastBuildDate>Sun, 22 Mar 2026 20:47:15 +0000</lastBuildDate>
	<language>en-NZ</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://vitruvius.co.nz/wp-content/uploads/login-logo.png</url>
	<title>Transport Advisory, Design and Delivery Archives - Vitruvius</title>
	<link>https://vitruvius.co.nz/project_category/transport-engineering/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Putauaki Kawerau Container Terminal (PKCT)</title>
		<link>https://vitruvius.co.nz/project/putauaki-kawerau-container-terminal-pkct/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Tue, 10 Mar 2026 03:07:42 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=3014</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/putauaki-kawerau-container-terminal-pkct/">Putauaki Kawerau Container Terminal (PKCT)</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p><img decoding="async" class="alignnone wp-image-3009 size-thumbnail" src="https://vitruvius.co.nz/wp-content/uploads/Nigel-test-150x150.png" alt="" width="150" height="150" srcset="https://vitruvius.co.nz/wp-content/uploads/Nigel-test-150x150.png 150w, https://vitruvius.co.nz/wp-content/uploads/Nigel-test-300x300.png 300w, https://vitruvius.co.nz/wp-content/uploads/Nigel-test-1024x1024.png 1024w, https://vitruvius.co.nz/wp-content/uploads/Nigel-test-800x800.png 800w, https://vitruvius.co.nz/wp-content/uploads/Nigel-test-400x400.png 400w, https://vitruvius.co.nz/wp-content/uploads/Nigel-test.png 1240w" sizes="(max-width: 150px) 100vw, 150px" />Article written by:<span> </span><a href="https://vitruvius.co.nz/our_team/mitchell-alley/nigel-holman/">Nigel Holman &#8211; Service Leader Road Engineering</a></p>
<p>Vitruvius is proud to be supporting the delivery of the Putauaki Kawerau Container Terminal (PKCT). This is a landmark infrastructure project that will establish a new rail freight hub for the Eastern Bay of Plenty and unlock long‑term economic benefits for the region.</p>
<p>We are currently assisting PKCT by overseeing construction supervision and providing surveying set-out services for a complex and tightly scheduled build. Our role spans end‑to‑end engineering and planning services, including rail design, stormwater assessment, traffic impact assessment, civil and roading design, integrated stormwater management, and working closely with Engeo to undertake the specialist geotechnical investigations and design.</p>
<p>Supported by the Provincial Growth Fund, this initiative represents over five years of planning and serves as a pivotal driver for enhancing regional supply chains and supporting local industry within the Eastern Bay of Plenty.</p>
<p>Once operational, PKCT is expected to remove up to approximately 18,000 heavy truck movements from surrounding roads each year, reducing congestion, improving safety, and delivering meaningful reductions in CO₂ emissions.</p>
<p>The project is now well into its construction phase. Over the Christmas break, Vitruvius worked closely with the Contractor and the Principal to deliver the important first stage of the programme, setting the project up for a strong start. Taking advantage of the Christmas block of line, we reinstated more than 200 metres of existing track.</p>
<p>As the project progresses toward its planned opening in mid‑2026, our team will continue working alongside the contractor and PKCT to deliver:</p>
<ul>
<li>a new 750 metre long loading platform</li>
<li>approximately 1.2 kilometres of new heavy duty rail track</li>
<li>more than one hectare of new container storage area</li>
<li>around 100,000 cubic metres of earthworks and imported fill</li>
<li>new stormwater storage and road access infrastructure.</li>
</ul>
<p>The PKCT project reflects Vitruvius’ broader capability to deliver complex infrastructure projects that will make a real difference to the region and local community. We are proud of the progress achieved to date and look forward to continuing our contribution as this important project reaches its next milestones.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project</strong>: <span data-teams="true">Putauaki Kawerau Container Terminal (PKCT)</span><br />
<strong>Client:</strong> Kawerau Container Terminal Co Limited<br />
<strong>When</strong>: 2025 &#8211; Ongoing<br />
<strong>Vitruvius Scope: </strong>Project Management, Rail Design, Civil and Stormwater Design, Traffic Impact Assessment, Stormwater Management &amp; Assessment and Construction Management</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/putauaki-kawerau-container-terminal-pkct/">Putauaki Kawerau Container Terminal (PKCT)</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Corridor-Level Planning to Align Water Infrastructure and Road Renewals</title>
		<link>https://vitruvius.co.nz/project/corridor-level-planning-to-align-water-infrastructure-and-road-renewals/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Wed, 25 Feb 2026 22:38:49 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=2988</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/corridor-level-planning-to-align-water-infrastructure-and-road-renewals/">Corridor-Level Planning to Align Water Infrastructure and Road Renewals</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p><img decoding="async" class="alignnone wp-image-2438 size-thumbnail" src="https://vitruvius.co.nz/wp-content/uploads/Albert-150x150.png" alt="" width="150" height="150" srcset="https://vitruvius.co.nz/wp-content/uploads/Albert-150x150.png 150w, https://vitruvius.co.nz/wp-content/uploads/Albert-300x300.png 300w, https://vitruvius.co.nz/wp-content/uploads/Albert-1024x1024.png 1024w, https://vitruvius.co.nz/wp-content/uploads/Albert-800x800.png 800w, https://vitruvius.co.nz/wp-content/uploads/Albert-400x400.png 400w, https://vitruvius.co.nz/wp-content/uploads/Albert-600x600.png 600w, https://vitruvius.co.nz/wp-content/uploads/Albert.png 1267w" sizes="(max-width: 150px) 100vw, 150px" />Article written by: <a href="https://vitruvius.co.nz/our_team/albert-ho-2/">Albert Ho – Service Leader – Civil and Water Engineering</a></p>
<p>This project demonstrates how corridor-level planning can align renewal programmes and improve delivery efficiency in complex urban environments.</p>
<p>Vitruvius undertook corridor-scale assessments across Beach Haven, Onewa Road and Browns Bay Road to align Healthy Waters’ stormwater renewal priorities with Auckland Transport’s FY25/26 road rehabilitation programme. The objective was to identify stormwater renewals, operational issues and treatment opportunities that could be delivered concurrently with planned road works, supporting a coordinated “dig once” approach.</p>
<p>These corridors are high-traffic, community-sensitive environments with constrained working space, dense utilities and limited access. Asset condition, operational performance, flooding behaviour and capacity constraints were assessed using an integrated evidence base combining asset inspections, modelling outputs, service requests (RFS), condition data and operational insight.</p>
<p>The technical review was undertaken alongside engagement with Healthy Waters Operations, Planning, Design and Delivery, Asset Management teams and maintenance partners to validate findings, confirm constructability constraints and address data gaps. Technical and operational inputs informed prioritisation of interventions, balancing resilience and risk reduction objectives with budget availability and programme timing considerations, while supporting long-term network performance.</p>
<p>Assessments were completed within a six-week timeframe to align with Auckland Transport’s renewal programme. Coordinated planning enabled integration of stormwater and road works, minimising disruption to residents, businesses and road users, avoiding unnecessary re-excavation, and reducing duplicate traffic management across programmes.</p>
<p>If you are looking to better align renewal programmes, optimise investment or reduce community disruption in complex urban environments, our team would welcome a conversation. <span data-contrast="auto" xml:lang="EN-NZ" lang="EN-NZ" class="TextRun SCXW12916401 BCX0"><span class="NormalTextRun SCXW12916401 BCX0">Please get in touch via our website:</span><span class="NormalTextRun SCXW12916401 BCX0"><span> </span></span></span><a class="Hyperlink SCXW12916401 BCX0" href="https://vitruvius.co.nz/contact/" target="_blank" rel="noreferrer noopener"><span data-contrast="none" xml:lang="EN-NZ" lang="EN-NZ" class="TextRun Underlined SCXW12916401 BCX0"><span class="NormalTextRun SCXW12916401 BCX0" data-ccp-charstyle="Hyperlink">https://vitruvius.co.nz/contact/</span></span></a><span data-contrast="auto" xml:lang="EN-NZ" lang="EN-NZ" class="TextRun EmptyTextRun SCXW12916401 BCX0"></span><span class="EOP SCXW12916401 BCX0" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559740&quot;:300}"> </span></p>
<p style="text-align: center;"><span><img fetchpriority="high" decoding="async" class="alignnone wp-image-2989" src="https://vitruvius.co.nz/wp-content/uploads/Picture1-2-300x162.png" alt="" width="331" height="179" srcset="https://vitruvius.co.nz/wp-content/uploads/Picture1-2-300x162.png 300w, https://vitruvius.co.nz/wp-content/uploads/Picture1-2-600x323.png 600w, https://vitruvius.co.nz/wp-content/uploads/Picture1-2.png 635w" sizes="(max-width: 331px) 100vw, 331px" /></span></p>
<p style="text-align: center;">Figure 1 &#8211; Opportunity at Onewa Road to coordinate asset renewal and water quality improvement with road works</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project</strong>: Corridor-Level Planning to Align Water Infrastructure and Road Renewals<br />
<strong>Client:</strong> Auckland Council Healthy Waters<br />
<strong>When</strong>: 2025 &#8211; Ongoing<br />
<strong>Vitruvius Scope: </strong>Asset management, stormwater management, risk mitigation, business case, water quality improvement</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/corridor-level-planning-to-align-water-infrastructure-and-road-renewals/">Corridor-Level Planning to Align Water Infrastructure and Road Renewals</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Links Avenue Transformation &#8211; Commuter Safety and Connectivity</title>
		<link>https://vitruvius.co.nz/project/links-ave-transformation-commuter-safety-and-connectivity/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Thu, 27 Jun 2024 02:17:16 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=2201</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/links-ave-transformation-commuter-safety-and-connectivity/">Links Avenue Transformation &#8211; Commuter Safety and Connectivity</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p>Vitruvius was proud to be involved in the Links Avenue project, a high‑profile programme of works for Tauranga City Council (TCC). The project was not without its challenges, and following a number of issues over several years, Vitruvius was engaged to undertake the design and MSQA works for the troubled corridor.<span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">The corridor along Links Ave is crucial for the local community, particularly with its proximity to several schools and the high volume of pedestrian, cycle, and bus traffic. Recognising this, Vitruvius designed and implemented a shared use area that prioritises safety for cyclists of all ages. This was achieved through the strategic placement of separation islands and hit sticks, ensuring a secure passage for commuters traveling to school and work.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Throughout design TCC identified the corridor as strategically significant and consequently a dedicated maintenance budget was allocated to comprehensively rehabilitate the pavement with concrete. This enhancement not only strengthens the corridor but also supports the anticipated growth of the bus network and increased bus movements in the future.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559685&quot;:0,&quot;335559737&quot;:0,&quot;335559738&quot;:60,&quot;335559739&quot;:60,&quot;335559740&quot;:276}"> </span></p>
<p><span data-contrast="auto">Key achievements of the project include:</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276}"> </span></p>
<ul>
<li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:&#091;8226&#093;,&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}" aria-setsize="-1" data-aria-posinset="9" data-aria-level="1"><b><span data-contrast="none">Innovative Design Solutions:</span></b><span data-contrast="none"> Incorporating advanced design elements to create a safe and accessible environment for all road users.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276,&quot;469777462&quot;:&#091;0,720&#093;,&quot;469777927&quot;:&#091;0,0&#093;,&quot;469777928&quot;:&#091;1,1&#093;}"> </span></li>
<li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:&#091;8226&#093;,&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}" aria-setsize="-1" data-aria-posinset="10" data-aria-level="1"><b><span data-contrast="none">Timely Execution:</span></b><span data-contrast="none"> Managing site activities efficiently, including design adaptations and rapid solutions delivery, to meet stringent construction deadlines.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276,&quot;469777462&quot;:&#091;0,720&#093;,&quot;469777927&quot;:&#091;0,0&#093;,&quot;469777928&quot;:&#091;1,1&#093;}"> </span></li>
<li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:&#091;8226&#093;,&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}" aria-setsize="-1" data-aria-posinset="11" data-aria-level="1"><b><span data-contrast="none">Integrated Approach:</span></b><span data-contrast="none"> Seamlessly integrating pavement rehabilitation and cycleway installation over a 1.3km stretch during a critical two-week school holiday period.</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:276,&quot;469777462&quot;:&#091;0,720&#093;,&quot;469777927&quot;:&#091;0,0&#093;,&quot;469777928&quot;:&#091;1,1&#093;}"> </span></li>
</ul>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project:</strong> Links Ave Transformation &#8211; Commuter Safety and Connectivity<br />
<strong>Client:</strong> Tauranga City Council<br />
<strong>When:</strong> 2023 &#8211; 2024<br />
<strong>Vitruvius Scope:</strong> Civil Engineering Design, Project Management, Survey, Transport Engineering</p>
<p><img loading="lazy" decoding="async" class="wp-image-2203 size-us_600_400 aligncenter" src="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222150o1s1-600x392.jpeg" alt="" width="600" height="392" srcset="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222150o1s1-600x392.jpeg 600w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222150o1s1-300x196.jpeg 300w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222150o1s1-1024x669.jpeg 1024w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222150o1s1-1225x800.jpeg 1225w" sizes="auto, (max-width: 600px) 100vw, 600px" />  <img loading="lazy" decoding="async" class="wp-image-2205 size-us_600_400 aligncenter" src="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624220815aims-600x393.jpeg" alt="" width="600" height="393" srcset="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624220815aims-600x393.jpeg 600w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624220815aims-300x196.jpeg 300w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624220815aims-1024x670.jpeg 1024w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624220815aims-1222x800.jpeg 1222w" sizes="auto, (max-width: 600px) 100vw, 600px" />  <img loading="lazy" decoding="async" class="wp-image-2204 size-us_600_400 aligncenter" src="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222107vLlD-600x390.jpeg" alt="" width="600" height="390" srcset="https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222107vLlD-600x390.jpeg 600w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222107vLlD-300x195.jpeg 300w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222107vLlD-1024x666.jpeg 1024w, https://vitruvius.co.nz/wp-content/uploads/wepik-20240624222107vLlD-1230x800.jpeg 1230w" sizes="auto, (max-width: 600px) 100vw, 600px" /></p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section><section class="l-section wpb_row height_auto width_full"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"></div></div></div></div></section><section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="w-separator size_medium"></div><div class="w-separator size_medium"></div><div class="ult-spacer spacer-69cedebc2dcf9" data-id="69cedebc2dcf9" data-height="40" data-height-mobile="40" data-height-tab="40" data-height-tab-portrait="" data-height-mobile-landscape="" style="clear:both;display:block;"></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/links-ave-transformation-commuter-safety-and-connectivity/">Links Avenue Transformation &#8211; Commuter Safety and Connectivity</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cameron Road Multi Modal Upgrade Stage 1</title>
		<link>https://vitruvius.co.nz/project/cameron-road-multi-modal-upgrade/</link>
		
		<dc:creator><![CDATA[Tom Lear]]></dc:creator>
		<pubDate>Tue, 06 Apr 2021 04:17:10 +0000</pubDate>
				<guid isPermaLink="false">https://virtruvius.nzstaging.com/?post_type=project&#038;p=508</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/cameron-road-multi-modal-upgrade/">Cameron Road Multi Modal Upgrade Stage 1</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p>Tauranga’s main arterial route, Cameron Road, was upgraded and future‑proofed from Harington Street in the city centre to Seventeenth Avenue beside Tauranga Hospital. The project improved safety and streetscape quality while providing more transport choices, enabling people to walk, cycle, scooter, catch a bus or drive with greater confidence. The project was almost entirely Government‑funded through the Crown Infrastructure Partners’ Shovel Ready initiative, supporting local economic recovery following COVID‑19.</p>
<p>Vitruvius provided programme and project management services to Tauranga City Council. With a strong understanding of Council processes, objectives and operating environment, our team brought a proven track record of delivering complex, multidisciplinary projects within tight timeframes.</p>
<p>Throughout the project, Vitruvius delivered robust risk management and quality assurance, applied specialist infrastructure delivery and risk mitigation expertise, and identified and managed key project milestones and deliverables. We also fostered a highly collaborative working environment with contractors and fellow consultants.</p>
<p>Vitruvius was responsible for managing the detailed design and Early Contractor Involvement (ECI) process, as well as overseeing the public communication and engagement strategy.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p>Project: Futureproofing Cameron Road<br />
Client: Tauranga City Council<br />
When: 2020 – 2024<br />
Project value: $45m infrastructure project<br />
Vitruvius Scope: Project Management and Delivery</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/cameron-road-multi-modal-upgrade/">Cameron Road Multi Modal Upgrade Stage 1</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Tunnel 21 between Kaikoura and Blenheim</title>
		<link>https://vitruvius.co.nz/project/tunnel-21-between-kaikoura-and-blenheim/</link>
		
		<dc:creator><![CDATA[virtruvius_managewp]]></dc:creator>
		<pubDate>Fri, 05 Mar 2021 13:03:27 +0000</pubDate>
				<guid isPermaLink="false">https://virtruvius.nzstaging.com/?post_type=project&#038;p=47</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/tunnel-21-between-kaikoura-and-blenheim/">Tunnel 21 between Kaikoura and Blenheim</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p>Tunnel 21, which is located between Kaikoura and Blenheim on KiwiRail’s Main North Line, had to be upgraded to achieve minimum clearance standards, improve line speed and importantly, increase the overall network resilience of the line following the North Canterbury Transport Infrastructure Recovery (NCTIR) project.<span class="Apple-converted-space"> </span></p>
<p>Vitruvius was brought into the project based on our expertise in spatial survey and design, road design, rail geometric design and digital engineering. We surveyed the track alignment and inside of the tunnel using laser scanning technology to produce a 3D model for the track design. Using KiwiRail rolling stock data, a full spatial assessment of the tunnel was completed based on the types of rail vehicles in use on the main north line.<span class="Apple-converted-space"> </span></p>
<p>Following that survey work, a thorough optioneering exercise was undertaken in partnership with KiwiRail and other specialist consultants, to explore how we would make the tunnel more resilient and improve the line speed with an efficient and effective solution. The preferred solution, which has now been delivered, involved a new offline rail alignment through a 500,000m³ cutting, and a new road over rail crossing structure. The state highway also required an online re-alignment to accommodate the works.<span class="Apple-converted-space"> </span></p>
<p>This project was complex due to a number of factors: the state highway crosses over the railway lines; geometry; safety and cost for scale of earth and structural works; environmental considerations of sensitive wetlands; and private access routes.</p>
<p>We managed the digital model and interface to provide information from the contractor through BIM delivery.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><b>Project</b>: Tunnel 21 Main North Line Resilience Improvements<br />
<b>Client:</b> KiwiRail<br />
<b>When</b>: 2018 &#8211; 2019<br />
<b>Vitruvius Scope: </b>Transport Engineering, Digital Engineering, Three Waters</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section><section class="l-section wpb_row height_auto width_full"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="w-grid type_masonry layout_606 cols_3 with_isotope" id="us_grid_1" style="--gap:0.5rem;" data-filterable="true"><style>@media (max-width:1024px){#us_grid_1 .w-grid-item{width:50%}}@media (max-width:600px){#us_grid_1 .w-grid-list{margin:0}#us_grid_1 .w-grid-item{width:100%;padding:0;margin-bottom:var(--gap,0px)}}.layout_606 .w-grid-item-h{}</style><div class="w-grid-list">	<article class="w-grid-item size_1x1 post-867 attachment type-attachment status-inherit hentry" data-id="867">
		<div class="w-grid-item-h">
							<a ref="magnificPopupGrid" href="https://vitruvius.co.nz/wp-content/uploads/Image9.jpg" class="w-grid-item-anchor" aria-label="Image9"></a>
						<div class="w-post-elm post_image usg_post_image_1"><img loading="lazy" decoding="async" width="600" height="400" src="https://vitruvius.co.nz/wp-content/uploads/Image9.jpg" class="attachment-full size-full" alt="" srcset="https://vitruvius.co.nz/wp-content/uploads/Image9.jpg 600w, https://vitruvius.co.nz/wp-content/uploads/Image9-300x200.jpg 300w" sizes="auto, (max-width: 600px) 100vw, 600px" /></div>		</div>
			</article>
	<article class="w-grid-item size_1x1 post-866 attachment type-attachment status-inherit hentry" data-id="866">
		<div class="w-grid-item-h">
							<a ref="magnificPopupGrid" href="https://vitruvius.co.nz/wp-content/uploads/Image8.jpg" class="w-grid-item-anchor" aria-label="Image8"></a>
						<div class="w-post-elm post_image usg_post_image_1"><img loading="lazy" decoding="async" width="600" height="400" src="https://vitruvius.co.nz/wp-content/uploads/Image8.jpg" class="attachment-full size-full" alt="" srcset="https://vitruvius.co.nz/wp-content/uploads/Image8.jpg 600w, https://vitruvius.co.nz/wp-content/uploads/Image8-300x200.jpg 300w" sizes="auto, (max-width: 600px) 100vw, 600px" /></div>		</div>
			</article>
	<article class="w-grid-item size_1x1 post-865 attachment type-attachment status-inherit hentry" data-id="865">
		<div class="w-grid-item-h">
							<a ref="magnificPopupGrid" href="https://vitruvius.co.nz/wp-content/uploads/Image7.jpg" class="w-grid-item-anchor" aria-label="Image7"></a>
						<div class="w-post-elm post_image usg_post_image_1"><img loading="lazy" decoding="async" width="600" height="400" src="https://vitruvius.co.nz/wp-content/uploads/Image7.jpg" class="attachment-full size-full" alt="" srcset="https://vitruvius.co.nz/wp-content/uploads/Image7.jpg 600w, https://vitruvius.co.nz/wp-content/uploads/Image7-300x200.jpg 300w" sizes="auto, (max-width: 600px) 100vw, 600px" /></div>		</div>
			</article>
</div><div class="w-grid-preloader">	<div class="g-preloader type_1">
		<div></div>
	</div>
	</div>	<div class="w-grid-json hidden" onclick='return {&quot;action&quot;:&quot;us_ajax_grid&quot;,&quot;infinite_scroll&quot;:0,&quot;max_num_pages&quot;:1,&quot;pagination&quot;:&quot;none&quot;,&quot;template_vars&quot;:{&quot;columns&quot;:&quot;3&quot;,&quot;exclude_items&quot;:&quot;none&quot;,&quot;img_size&quot;:&quot;default&quot;,&quot;ignore_items_size&quot;:0,&quot;items_layout&quot;:&quot;606&quot;,&quot;items_offset&quot;:&quot;1&quot;,&quot;load_animation&quot;:&quot;none&quot;,&quot;overriding_link&quot;:&quot;%7B%22type%22%3A%22popup_image%22%7D&quot;,&quot;post_id&quot;:4,&quot;query_args&quot;:{&quot;post_type&quot;:[&quot;attachment&quot;],&quot;post__in&quot;:[&quot;865&quot;,&quot;866&quot;,&quot;867&quot;],&quot;post_status&quot;:&quot;inherit&quot;,&quot;post_mime_type&quot;:&quot;image&quot;,&quot;posts_per_page&quot;:&quot;100&quot;},&quot;orderby_query_args&quot;:{&quot;orderby&quot;:{&quot;date&quot;:&quot;DESC&quot;}},&quot;type&quot;:&quot;masonry&quot;,&quot;us_grid_post_type&quot;:&quot;attachment&quot;,&quot;us_grid_ajax_index&quot;:1,&quot;us_grid_filter_query_string&quot;:null,&quot;us_grid_index&quot;:1,&quot;page_args&quot;:{&quot;page_type&quot;:&quot;archive&quot;,&quot;taxonomy_type&quot;:&quot;&quot;}}}'></div>
	</div></div></div></div></div></section><section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="w-separator size_small"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/tunnel-21-between-kaikoura-and-blenheim/">Tunnel 21 between Kaikoura and Blenheim</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Cameron Road Utilities Mapping</title>
		<link>https://vitruvius.co.nz/project/cameron-rd-utilities-mapping/</link>
		
		<dc:creator><![CDATA[Aielet van den Heever]]></dc:creator>
		<pubDate>Tue, 15 Feb 2022 19:53:40 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=1157</guid>

					<description><![CDATA[<p>Project: Cameron Road Utilities Mapping Client: Tauranga City Council When: 2020 Project Value: $45m Capital Works Vitruvius Scope: Transport Engineering, Project Management, Surveying Services, and Digital Engineering</p>
<p>The post <a href="https://vitruvius.co.nz/project/cameron-rd-utilities-mapping/">Cameron Road Utilities Mapping</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_custom laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"></div></div></section><div class="wpb_column vc_column_container"><div class="vc_column-inner"></div></div><div class="g-cols wpb_row via_grid cols_custom laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"></div><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p>Cameron Road is one of Tauranga’s main arterial routes with many businesses, schools and the hospital located along it.</p>
<p>Council was successful in securing $45 million for this project from central Government that was part of the Crown Infrastructure Projects (CIP) Initiative to support New Zealand’s recovery from COVID-19. Primarily this was because the project aligns with the Government’s overarching objectives to support growth, safety, alternate transport choices and create attractive public spaces for the community.</p>
<p>Vitruvius led the delivery of this important project via our Programme and Project Management expertise, while also providing Surveying Services and Digital Engineering support. This involved best practice utility modelling to inform the detailed design being done by others. Utility detection is an important step in managing risk for any project looking to modify the footpath or road, with each identified utility reducing the likelihood of service strike during construction. The digital model created by Vitruvius will further provide a ‘virtual twin’ for long-term asset management well after this project is completed.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"></div></div><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"></div></div><strong>Project: </strong>Cameron Road Utilities Mapping<br />
<strong>Client:</strong> Tauranga City Council<br />
<strong>When:</strong> 2020<br />
<strong>Project Value:</strong> $45m Capital Works<br />
<strong>Vitruvius Scope:</strong> Transport Engineering, Project Management, Surveying Services, and Digital Engineering</p>
<p>The post <a href="https://vitruvius.co.nz/project/cameron-rd-utilities-mapping/">Cameron Road Utilities Mapping</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Waka Kotahi Harini Link</title>
		<link>https://vitruvius.co.nz/project/waka-kotahi-harini-link/</link>
		
		<dc:creator><![CDATA[Aielet van den Heever]]></dc:creator>
		<pubDate>Tue, 15 Feb 2022 19:50:09 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=1148</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/waka-kotahi-harini-link/">Waka Kotahi Harini Link</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p>This project was to investigate and construct a new road link from State Highway 2a, de-conflicting traffic priorities on State Highway 29 to the Port of Tauranga.</p>
<p>Vitruvius acted as project manager through the investigation and onto the specimen design phase. This investigation took 2½ years to complete amid strong political and public interest.</p>
<p>Vitruvius also provided project management to oversee the compilation of tender documentation, tender process management and the appointment of a professional services provider to deliver the specimen design.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project</strong>: Hairini Link SH2a and SH29, Tauranga</p>
<p><strong>Client:</strong>  Waka Kotahi NZ Transport Agency</p>
<p><strong>When</strong>: 2014 &#8211; 2017</p>
<p><strong>Vitruvius Scope: </strong>Strategic Advisory Services, Project Management</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section><section class="l-section wpb_row height_auto width_full"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"></div></div></div></div></section><section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="w-separator size_medium"></div><div class="w-separator size_medium"></div><div class="ult-spacer spacer-69cedebc3c8b8" data-id="69cedebc3c8b8" data-height="40" data-height-mobile="40" data-height-tab="40" data-height-tab-portrait="" data-height-mobile-landscape="" style="clear:both;display:block;"></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/waka-kotahi-harini-link/">Waka Kotahi Harini Link</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>68-Lot Subdivision &#8211; Smith Street, Waihi</title>
		<link>https://vitruvius.co.nz/project/68-lot-subdivision-smith-street-waihi/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Sun, 22 Mar 2026 20:47:15 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=3062</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/68-lot-subdivision-smith-street-waihi/">68-Lot Subdivision &#8211; Smith Street, Waihi</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p><img loading="lazy" decoding="async" class="alignnone wp-image-2536 size-thumbnail" src="https://vitruvius.co.nz/wp-content/uploads/Mitch-150x150.png" alt="" width="150" height="150" srcset="https://vitruvius.co.nz/wp-content/uploads/Mitch-150x150.png 150w, https://vitruvius.co.nz/wp-content/uploads/Mitch-300x300.png 300w, https://vitruvius.co.nz/wp-content/uploads/Mitch-1024x1024.png 1024w, https://vitruvius.co.nz/wp-content/uploads/Mitch-800x800.png 800w, https://vitruvius.co.nz/wp-content/uploads/Mitch-400x400.png 400w, https://vitruvius.co.nz/wp-content/uploads/Mitch.png 1264w" sizes="auto, (max-width: 150px) 100vw, 150px" />Article written by: <a href="https://vitruvius.co.nz/our_team/mitchell-alley/">Mitchell Alley &#8211; Project Delivery Manager</a></p>
<p>The Smith Street Development is an ongoing greenfield residential subdivision at the eastern edge of Waihi, transforming 6.1 hectares of former pastoral land into a 68 lot neighbourhood designed to support long term community growth.</p>
<p>Vitruvius has been involved from the outset, providing civil engineering design, surveying, and MSQA services through planning, consenting, and construction. Our team is working closely with Classic Developments Ltd and a multidisciplinary consultant group to resolve site constraints and deliver coordinated, buildable design solutions.</p>
<p>The project presents a range of technical and environmental challenges, including flood hazard management, stream and wetland interfaces, embankment stability, fish passage requirements, contaminated soils, and stormwater discharge effects. Vitruvius has undertaken early infrastructure and flood assessments, prepared Assessments of Environmental Effects, and led the civil design process through District and Regional Council consenting.</p>
<p>Earthworks have been completed over two construction seasons, establishing the final landform and enabling staged delivery of civil infrastructure. Stage 1 works are currently underway and include internal roading and servicing, significant retaining structures, a new neighbourhood reserve, walking tracks along the internal stream, and integrated wetland and stormwater systems that enhance both functionality and amenity.</p>
<p>Through close collaboration and a rigorous design approach, Vitruvius is continuing to unlock value on a complex site, delivering a resilient and well-considered development that balances engineering performance, environmental outcomes, and future liveability.</p>
<p>.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p> <strong>Project:</strong> 68-Lot Subdivision -Smith Street, Waihi<br />
<strong>Client:</strong> Classic Developments Limited<br />
<strong>When:</strong> 2024 &#8211; Ongoing<br />
<strong>Vitruvius Scope:</strong> Civil Engineering Design, Project Management, Survey, Transport Engineering, MSQA</p>
<p>&nbsp;</p>
<p><img loading="lazy" decoding="async" class=" wp-image-3063 alignleft" src="https://vitruvius.co.nz/wp-content/uploads/Picture1-3-291x300.png" alt="" width="297" height="306" srcset="https://vitruvius.co.nz/wp-content/uploads/Picture1-3-291x300.png 291w, https://vitruvius.co.nz/wp-content/uploads/Picture1-3.png 340w" sizes="auto, (max-width: 297px) 100vw, 297px" /></p>
<p><img loading="lazy" decoding="async" class="alignnone  wp-image-3067" src="https://vitruvius.co.nz/wp-content/uploads/Screenshot-2026-03-23-094515-300x300.png" alt="" width="318" height="318" srcset="https://vitruvius.co.nz/wp-content/uploads/Screenshot-2026-03-23-094515-300x300.png 300w, https://vitruvius.co.nz/wp-content/uploads/Screenshot-2026-03-23-094515-150x150.png 150w, https://vitruvius.co.nz/wp-content/uploads/Screenshot-2026-03-23-094515-399x400.png 399w, https://vitruvius.co.nz/wp-content/uploads/Screenshot-2026-03-23-094515.png 760w" sizes="auto, (max-width: 318px) 100vw, 318px" /></p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/68-lot-subdivision-smith-street-waihi/">68-Lot Subdivision &#8211; Smith Street, Waihi</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Links Avenue Reserve – A Premier FIFA Grade Football Destination</title>
		<link>https://vitruvius.co.nz/project/links-avenue-upgrade-vitruvius-driving-success-on-site/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Fri, 28 Feb 2025 00:37:36 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=2535</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/links-avenue-upgrade-vitruvius-driving-success-on-site/">Links Avenue Reserve – A Premier FIFA Grade Football Destination</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p><img loading="lazy" decoding="async" class="alignnone wp-image-2536 size-thumbnail" src="https://vitruvius.co.nz/wp-content/uploads/Mitch-150x150.png" alt="" width="150" height="150" srcset="https://vitruvius.co.nz/wp-content/uploads/Mitch-150x150.png 150w, https://vitruvius.co.nz/wp-content/uploads/Mitch-300x300.png 300w, https://vitruvius.co.nz/wp-content/uploads/Mitch-1024x1024.png 1024w, https://vitruvius.co.nz/wp-content/uploads/Mitch-800x800.png 800w, https://vitruvius.co.nz/wp-content/uploads/Mitch-400x400.png 400w, https://vitruvius.co.nz/wp-content/uploads/Mitch.png 1264w" sizes="auto, (max-width: 150px) 100vw, 150px" />Article written by: <a href="https://vitruvius.co.nz/our_team/mitchell-alley/">Mitchell Alley &#8211; Project Delivery Manager</a></p>
<p>The transformation of Links Avenue Reserve represents a major step forward for local sport and recreation, delivering a high-quality football destination designed for all ages and abilities.</p>
<p>Vitruvius played a central role throughout the project, leading all design phases and providing comprehensive MSQA and Engineer’s Representative services from inception through to delivery. Our team worked closely with project partners and stakeholders to ensure the final outcome met rigorous standards for quality, safety, and long-term community value.</p>
<p>The upgrade included a FIFA-grade artificial football pitch, supported by significant improvements to stormwater and wastewater infrastructure. Over 2,000 metres of advanced Megaflo drainage help maintain playing performance year-round, complemented by a soakage system beneath the car park to effectively manage runoff. Improved access, parking, and modern amenities ensure the Reserve functions as a welcoming and practical space for both players and spectators.</p>
<p>Since opening, the Reserve has become a key hub for football and wider community activity, supporting increased participation and providing a safe, well-designed environment for organised sport and informal use alike. The quality of the finished asset reflects a strong collaborative effort and a shared commitment to enhancing Tauranga’s sporting infrastructure.</p>
<p>Today, Links Avenue Reserve stands as a premier sporting asset for the region &#8211; one that supports grassroots sport, enables high-quality competition, and delivers lasting benefits for the Bay of Plenty community.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project</strong>: Links Avenue Upgrade</p>
<p><strong>Client:</strong> Tauranga City Council<br />
<strong>When</strong>: 2024 &#8211; 2025<br />
<strong>Vitruvius Scope:</strong> <span data-teams="true">Civil Engineering Design, Project Management, Survey, Transport Engineering</span></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3036 size-full" src="https://vitruvius.co.nz/wp-content/uploads/4Drone-Photo-Report-Feb-20-2025-202502262313-2.png" alt="" width="512" height="341" srcset="https://vitruvius.co.nz/wp-content/uploads/4Drone-Photo-Report-Feb-20-2025-202502262313-2.png 512w, https://vitruvius.co.nz/wp-content/uploads/4Drone-Photo-Report-Feb-20-2025-202502262313-2-300x200.png 300w" sizes="auto, (max-width: 512px) 100vw, 512px" /></p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-3037 size-full" src="https://vitruvius.co.nz/wp-content/uploads/Drone-Photo-Report-Feb-20-2025-202502262313-1.png" alt="" width="512" height="341" srcset="https://vitruvius.co.nz/wp-content/uploads/Drone-Photo-Report-Feb-20-2025-202502262313-1.png 512w, https://vitruvius.co.nz/wp-content/uploads/Drone-Photo-Report-Feb-20-2025-202502262313-1-300x200.png 300w" sizes="auto, (max-width: 512px) 100vw, 512px" /></p>
<p><img loading="lazy" decoding="async" class="wp-image-3061 aligncenter" src="https://vitruvius.co.nz/wp-content/uploads/DJI_20251216115921_0013_291cd79d-ada5-4809-a26a-9bacbb5f9f9d-1-600x400.jpg" alt="" width="512" height="341" srcset="https://vitruvius.co.nz/wp-content/uploads/DJI_20251216115921_0013_291cd79d-ada5-4809-a26a-9bacbb5f9f9d-1-600x400.jpg 600w, https://vitruvius.co.nz/wp-content/uploads/DJI_20251216115921_0013_291cd79d-ada5-4809-a26a-9bacbb5f9f9d-1-300x200.jpg 300w, https://vitruvius.co.nz/wp-content/uploads/DJI_20251216115921_0013_291cd79d-ada5-4809-a26a-9bacbb5f9f9d-1-1024x683.jpg 1024w, https://vitruvius.co.nz/wp-content/uploads/DJI_20251216115921_0013_291cd79d-ada5-4809-a26a-9bacbb5f9f9d-1-1200x800.jpg 1200w" sizes="auto, (max-width: 512px) 100vw, 512px" /></p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/links-avenue-upgrade-vitruvius-driving-success-on-site/">Links Avenue Reserve – A Premier FIFA Grade Football Destination</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Dublin Street Level Crossing &#8211; Picton</title>
		<link>https://vitruvius.co.nz/project/dublin-street-level-crossing-picton-2/</link>
		
		<dc:creator><![CDATA[Gabby Surtees]]></dc:creator>
		<pubDate>Thu, 12 Mar 2026 20:42:01 +0000</pubDate>
				<guid isPermaLink="false">https://vitruvius.co.nz/?post_type=project&#038;p=3053</guid>

					<description><![CDATA[<p>The post <a href="https://vitruvius.co.nz/project/dublin-street-level-crossing-picton-2/">Dublin Street Level Crossing &#8211; Picton</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></description>
										<content:encoded><![CDATA[<section class="l-section wpb_row height_auto"><div class="l-section-h i-cf"><div class="g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="g-cols wpb_row via_grid cols_2 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default" style="--gap:3rem;"><div class="wpb_column vc_column_container"><div class="vc_column-inner"><div class="wpb_text_column"><div class="wpb_wrapper"><p><img decoding="async" src="https://vitruvius.co.nz/wp-content/uploads/Selwyn-Graeme-300x170.jpeg" />Article written by <a href="https://vitruvius.co.nz/our_team/selwyn-blackmore/">Selwyn Blackmore &#8211; Business Leader and Sector Lead &#8211; Transport</a>, and <a href="https://vitruvius.co.nz/our_team/graeme-corin/">Graeme Corin &#8211; Senior Transport Engineer</a></p>
<p>Vitruvius was engaged by KiwiRail to support the reopening of the Dublin Street/Auckland Street intersection and the adjacent road and rail level crossing in Picton. The intersection and crossing had been closed for over 12 months to accommodate access changes associated with the former IREX project. Following the Government’s decision to discontinue IREX, the reinstatement of this key connection was prioritised and has since been completed.</p>
<p>Vitruvius delivered an end‑to‑end design and delivery support package for KiwiRail to enable the reopening. Our role included leading the detailed road and rail design, civil design inputs, project management, construction supervision, and contract administration to NZS 3910. The project also involved close coordination with Marlborough District Council, Marlborough Roads, and NZTA to ensure the works were delivered efficiently and safely.</p>
<p>The reopening resolved a prolonged disruption to traffic movements and reinstated an important road and rail interface following an extended period of closure.</p>
</div></div></div></div><div class="wpb_column vc_column_container provided-services"><div class="vc_column-inner"><div class="wpb_text_column bullet-list-elements"><div class="wpb_wrapper"><p><strong>Project:</strong> Dublin Street Level Crossing &#8211; Picton<br />
<strong>Client:</strong> KiwiRail<br />
<strong>When:</strong> 2024<br />
<strong>Vitruvius Scope:</strong> Project and Design Management, Rail Infrastructure Design, Roading and Active Mode Design, Drainage and Potable Water Design, MSQA and Engineer Rep</p>
</div></div></div></div></div><div class="w-separator size_medium"></div></div></div></div></div></section>
<p>The post <a href="https://vitruvius.co.nz/project/dublin-street-level-crossing-picton-2/">Dublin Street Level Crossing &#8211; Picton</a> appeared first on <a href="https://vitruvius.co.nz">Vitruvius</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
