Article written by: Nigel Holman – Service Leader Road Engineering
Vitruvius is proud to be supporting the delivery of the Putauaki Kawerau Container Terminal (PKCT). This is a landmark infrastructure project that will establish a new rail freight hub for the Eastern Bay of Plenty and unlock long‑term economic benefits for the region.
We are currently assisting PKCT by overseeing construction supervision and providing surveying set-out services for a complex and tightly scheduled build. Our role spans end‑to‑end engineering and planning services, including rail design, stormwater assessment, traffic impact assessment, civil and roading design, integrated stormwater management, and working closely with Engeo to undertake the specialist geotechnical investigations and design.
Supported by the Provincial Growth Fund, this initiative represents over five years of planning and serves as a pivotal driver for enhancing regional supply chains and supporting local industry within the Eastern Bay of Plenty.
Once operational, PKCT is expected to remove up to approximately 18,000 heavy truck movements from surrounding roads each year, reducing congestion, improving safety, and delivering meaningful reductions in CO₂ emissions.
The project is now well into its construction phase. Over the Christmas break, Vitruvius worked closely with the Contractor and the Principal to deliver the important first stage of the programme, setting the project up for a strong start. Taking advantage of the Christmas block of line, we reinstated more than 200 metres of existing track.
As the project progresses toward its planned opening in mid‑2026, our team will continue working alongside the contractor and PKCT to deliver:
- a new 750 metre long loading platform
- approximately 1.2 kilometres of new heavy duty rail track
- more than one hectare of new container storage area
- around 100,000 cubic metres of earthworks and imported fill
- new stormwater storage and road access infrastructure.
The PKCT project reflects Vitruvius’ broader capability to deliver complex infrastructure projects that will make a real difference to the region and local community. We are proud of the progress achieved to date and look forward to continuing our contribution as this important project reaches its next milestones.
Project: Putauaki Kawerau Container Terminal (PKCT)
Client: Kawerau Container Terminal Co Limited
When: 2025 – Ongoing
Vitruvius Scope: Project Management, Rail Design, Civil and Stormwater Design, Traffic Impact Assessment, Stormwater Management & Assessment and Construction Management